A few of the many uses:
- Aircraft Hangers
- Disaster Relief - Emergency
Shelters
- Storage
- Scout Jamborees
- Hydroponics
- Field Offices
- Construction Site Offices
- Portable Bunk Houses
- Cooking Tents
-
Parties/Functions

Capable of
withstanding Wind Speeds up to Level 10 on the Beaufort
Scale (>100km/hour)
|
 |
|
Set
them up in just a few hours!
|
Specifications and Technical Details:
- Length = 11 meters (36.09)
- Width = 14 meters (45.93
feet
- Height = 4.8 meters (15.75)
-
Trussed Galvanized steel frame.
-
7 groups of arches and 7 groups of
purloins. The tubes are in diameter 60mm, thickness 1.5mm.
-
Heavy Duty 610g/m2 PVC coated
tarpaulin, having high tensile strength, UV resistant and fire
retardant.
-
Tarpaulin Color = White
-
Two Door Options
-
A sliding door in the front
panel, opening from the center to the sides. Door height:
2.2m. Clear door width: about 11m
-
A 3-zipper door in the front
panel. It allows the front panel to be almost fully opened
both in the width direction and in the height direction, so
as to fit taller pieces of equipment.
-
Can be easily bolted to a concrete
floor or staked or augured to ground for quick relocation
-
Capable of withstanding winds up to
Level 10 on the Beaufort Scale (100 Km/hour)
|
Price F.O.B.
Manila
P 535,000.00
|
|
A lot of
people use 40 foot Containers for temporary shelters.
Here is how they stack up against our product: |
| |
|
|
| |
Moveable Shelter |
Forty Foot Container |
|
Floor Space |
154 sq m (1,656 sq ft) |
29.3 sq m (320 sq ft) |
| |
|
requires 5-6 containers
to cover same floor space |
|
Investment |
P 535,000.00 |
approx P90,000.00 per
container therefore total investment around
P 450,000 to P 5400,000 (Not including Container Fit-out which can
run between P20,000 and P 50,000 per container. |
|
Number of Physical Units |
1 |
5-6 |
|
Number of Trucks required to move unit |
1 |
5-6 |
|
Time to position and set up |
1 day |
1 day (if crane does not
break down) |
|
Equipment required to set up |
4 men with basic tools
(can be hand loaded or unloaded to/from truck) |
Crane required for load
and unload (expensive) |
|
Available Space |
Open Span, complete floor
space available |
4-5 segmented spaces
(restricted by container walls) |
|
Ventilation |
Free flowing ventilation |
None unless windows
installed |
|
Maintenance |
Steel parts Galvanized.
Minimal Maintenance |
Constant Maintenance due
to rust |
|
Storage when not in use |
Racked in Steel Framed
Transport Cage |
Stackable, heavy
equipment required to store (Crane, etc) |