Welcome to MoveableShelters.com

The home of inexpensive demountable shelters and buildings

A few of the many uses:
  • Aircraft Hangers
  • Disaster Relief - Emergency Shelters
  • Storage
  • Scout Jamborees
  • Hydroponics
  • Field Offices
  • Construction Site Offices
  • Portable Bunk Houses
  • Cooking Tents
  • Parties/Functions

    Capable of withstanding Wind Speeds up to Level 10 on the Beaufort Scale (>100km/hour)

 

Set them up in just a few hours!
 

Specifications and Technical Details:
  • Length = 11 meters (36.09)
  • Width = 14 meters (45.93 feet
  • Height = 4.8 meters (15.75)
  • Trussed Galvanized steel frame.
  • 7 groups of arches and 7 groups of purloins. The tubes are in diameter 60mm, thickness 1.5mm.
  • Heavy Duty 610g/m2 PVC coated tarpaulin, having high tensile strength, UV resistant and fire retardant.
  • Tarpaulin Color = White
  • Two Door Options
    • A sliding door in the front panel, opening from the center to the sides. Door height: 2.2m. Clear door width: about 11m
    • A 3-zipper door in the front panel. It allows the front panel to be almost fully opened both in the width direction and in the height direction, so as to fit taller pieces of equipment.
  • Can be easily bolted to a concrete floor or staked or augured to ground for quick relocation
  • Capable of withstanding winds up to Level 10 on the Beaufort Scale (100 Km/hour)

Price F.O.B. Manila

P 535,000.00

 

A lot of people use 40 foot Containers for temporary shelters.
Here is how they stack up against our product:

     
  Moveable Shelter Forty Foot Container
Floor Space 154 sq m (1,656 sq ft) 29.3 sq m (320 sq ft)
    requires 5-6 containers to cover same floor space
Investment P 535,000.00 approx P90,000.00 per container therefore total investment around P 450,000 to P 5400,000 (Not including Container Fit-out which can run between P20,000 and P 50,000 per container.
Number of Physical Units 1 5-6
Number of Trucks required to move unit 1 5-6
Time to position and set up 1 day 1 day (if crane does not break down)
Equipment required to set up 4 men with basic tools
(can be hand loaded or unloaded to/from truck)
Crane required for load and unload (expensive)
Available Space Open Span, complete floor space available 4-5 segmented spaces (restricted by container walls)
Ventilation Free flowing ventilation None unless windows installed
Maintenance Steel parts Galvanized. Minimal Maintenance Constant Maintenance due to rust
Storage when not in use Racked in Steel Framed Transport Cage Stackable, heavy equipment required to store (Crane, etc)

 

Sliding Door Option

 

Three Zipper Door Option